[Systers-dev] Bi weekly update report

Malveeka Tewari malveeka at gmail.com
Sun Jul 12 13:37:54 PDT 2009


Hi

This week I did further work on writing the member adaptor with the orm
interface.
I have already pushed the code to the systers-dev/systers/auth branch. It'll
be great if I can get feedback on the code.
I have tested the accessing methods. (All "get" methods)
I still have to finish  writing the mutating methods (the "set" methods) and
test them.

This would take another 2-3 days.
By the end of this week, I plan writing to finish the Adaptor completely.
For next week, I plan to do the testing and documentation and bug fixing.

If you think this is a little slow,  maybe I can try to speed up things.
Spend a little more time over the weekend. Do let me know what suits
everyone the best.
After this is done, I think the next step would be working on integrating
Single Sign On.

I do not have very concrete plans on that as of now. Once we've finalized
the member adaptor, I can discuss with Jennifer on the next steps

Thanks
Malveeka


More information about the Systers-dev mailing list